Server Room near Berlin

Year of completion

2023

Contractor

PORR

Scope:

Beams

Single-layer walls

Stair flights and landings

Massive floor slabs

Columns

Prestressed beams

Hollow Core Slabs

Challenging Project

Server rooms are one of the biggest challenges in the construction world – we write about this in more detail on our blog.

This was no different in the case of the one executed near Berlin. Purely engineering issues were compounded by logistical ones.

Budizol delivers precast elements on time to the other side of the Baltic Sea, but the crossing of the Oder River itself requires precise planning and efficient execution. There were as many as 2141 elements to be delivered to the construction site! Naturally, in the correct sequence and at the right time, so that assembly could be carried out directly from the wheels (Just-In-Time) and thus minimize the need for on-site storage space.

This construction project was the biggest test of Budizol’s organizational capabilities in its history. From a purely engineering standpoint, it is also noteworthy due to two aspects:

  • Numerous prestressed precast elements necessary for transferring high loads
  • An uncommon number of installations accounted for in the BIM design executed to the LOD 500 standard